Zero Emissions Vehicle Infrastructure Program: Public Stream

 

This program is closed.

 

The Public stream of the ZEVIP program is for companies looking to install electric vehicle charging stations available for public use. It offered eligible recipients up to 50% of project costs to purchase and install electric vehicle (EV) charging stations, up to a maximum of $100,000 in funding per application.

 

Program Requirements

Eligibility

Eligible applicants include legal entities, validly incorporated or registered in Canada. Installed equipment must be a new and permanent installation for one of the following uses:

  • Workplaces

  • Multi-Unit Residential Buildings

  • Public Places

  • On-Street Parking

  • Light-Duty Fleets

To view the full details on program eligibility, please refer to sections 1.4 and 1.7 of the Applicant Guide.

 

Available EV Charger Incentives

Maximum Funding

Type of charger Technology Requirement Maximum funding
Level 2 (208/240 V) connectors
3.3 kW to 19.2 kW 
Any EV charger commercially available and CSA, ULC, UL or Interlink certified for use in Canada. The charger must have a SAE J1772 standard plug head or be a proprietary** connector type rated for a minimum of 3.3 kW power output.
Up to 50% of total project costs, to a maximum of $5,000 per connector* 
Fast charger
20 kW to 49 kW
Any EV fast charger commercially available and CSA, ULC, UL or Interlink certified for use in Canada. The fast charger must have at least one (1) charger connector that is CHAdeMO compliant, and one (1) charger connector that is SAE Combo or be a proprietary** connector type rated for a minimum of 20 kW power output.
Up to 50% of total project costs, to a maximum of $15,000 per fast charger
Fast charger
50 kW and above
Any EV fast charger commercially available and CSA, ULC, UL or Interlink certified for use in Canada. The fast charger must have at least one (1) charger connector that is CHAdeMO compliant and one (1) charger connector that is SAE J1772 Combo (CCS) or be a proprietary** connector type rated for a minimum of 50 kW power output.
Up to 50% of total project costs, to a maximum of $50,000 per fast charger

Eligible Costs Include:

  • Professional services, such as engineering, construction, installation and more

  • Related equipment and infrastructure

  • Rental or leasing costs

  • Licences and permits

  • Environmental assessment costs

  • GST, PST and HST net of any tax rebate to which the recipient is entitled

Please refer to section 1.5 of the Applicant Guide for full technology requirements and section 1.9 for the full list of eligible expenditures.

 

How to Apply

1. Complete your Application Online

  • Fill out and complete the online application form.

  • The program team will send an acknowledgement of receipt within three business days of the application submission.

  • Submissions will be reviewed on a first-come, first-served basis until funding has been allocated.

2. Assessment of Proposals and Virtual Audits

  • The program team will assess your proposal and send a letter of conditional approval or regret within 30 days of receipt of a completed submission.

  • You will be sent a Participant Agreement upon your proposal receiving conditional approval.

  • You will be contacted by a member of our team to schedule a virtual audit.

3. Negotiation and Signature of Participant Agreements

  • Upon your proposal receiving Conditional Approval, you will be asked to sign a Participant Agreement within 60 days.

4. Project Completion

  • The project timeline must show completion before December 1st, 2024.

For detailed instructions, please review the Applicant Guide and Terms and Conditions. The guide provides full details regarding eligibility, application steps, and project criteria. If you require further support, please get in touch.

 
 

Download media

  • No media available at this moment

With support from

 
Previous
Previous

Zero Emissions Vehicle Infrastructure Program -Fleets Stream

Next
Next

Moving Forward: Driving Electric Vehicles in Oshawa